PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Constructing the parapet along the high roof Facing West.jpg Continued laying out block at the 3rd floor detention cells Facing North-West.jpg Installed roof curbs at the High Roof Facing West.jpg Installed storm piping at the high roof Facing South-East.jpg Installed temporary lighting at the 4th floor Facing East.jpg Installing storm piping at the 3rd floor Facing North-East.jpg Erecting stone panels at the 4th floor East Elevation.jpg Erecting the stone panels at the East Elevation UCIA Roof 1.jpg Erecting the stone panels at the North Elevation UCIA Roof 5.jpg
Previous pageNext page Installed temporary lighting at the 4th floor Facing East
Installed temporary lighting at the 4th floor Facing East